Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | ABD |
Certification : | CE |
Price : | Negotiate |
Supply Ability : | 10 Set/Sets per Month |
Aluminum Profiles Full-Automatic Vertical Powder Coating Line
This proposal is designed for aluminum profiles vertical powder
coating line—One Booth
1,Design data
1)Coating Material : Aluminum Profile
2)Technical Description:Loading ,pre-treatment ,drying , powder
coating, Curing ,unloading .
3)Coating profile specifications:
a) Max size of the profile : 100mm×200mm×L7000mm
b) Max Weight of the profile: 30KG
c.)Standard weight : 3.5kg
d) Standard surface area of the profile : 400m2/T
e)Conveyor speed 1200mm/min (500mm/min ----- 20000mm/min adjustable
)
2,Energy supply
1)Power supply
a) Single-phase voltage:220V+10%
b) Three-phase voltage:380V+10%
c) Frequency:50Hz
d) Equipment group line and zero line
e) Natural gas
3,Compressed air
1)Pressure : 7.0bar
2)Max steam flux: 1.3g/nm3
3)Max oil content: 0.01ppm
4)Max Flux of the compressed air: 8m3/min
4,Industrial water required
1)Pressure : 3+0.2bar
2)Flux; 5m3/h
5,Pure water
1)Conductivity : 10us/cm
2)Flux; 4m3/h
6,Powder
1)Powder characteristic : LEL≥40g/Nm3
7,Space between material hanging : 66mm,100mm,133mm,150mm,200mm
8,Production Capacity
1)Conveying chain speed: 1.2m/minute
2)Total coating pcs per hour:
1200mm/minute÷150mm/pcs×60minutes=480pcs/hr
3)Total weight per hour:480pcs×3.5kg/pcs =1.68tons/hr
4)Daily capacitly: 1.68tons x 16 hrs/day = 26.8 tons/day
5)Monthly Capacity: 26.8 tons/day × 25 days/month= 670 tons/month
9,Process
Oridinary powder coating process
Foshan ABD Equipment Co., Ltd was founded in 2003. Since we
started, ABD has been doing great work on design, manufacturing,
and installation of aluminum surface treatment equipment, including
electrostatic powder coating lines, anodizing and coloring lines as
well as fluorocarbon liquid painting lines. We will create
customized designs and provide the vertical and horizontal types
for each customer based on their individual needs.
1. What should we provide if interested in your equipment ?
A. The material/size(max)/weight(max)of your workpieces.
B. What is the expected output of this equipment (8 hours/day,or 30
days/per month )?
C. The available workshop space which you plan to place this set of
equipment(in LxWxH) ?
D. What fuel do you prefer to use for heating
system:Electric,Gas,LPG,Diesel or others?
2. How to install equipment after purchasing your equipment ?
A. We will provide installation documents ,3D assembling drawing or
installation video to guide the installation work.
B. Our engineer will guide the equipment's installation and
debugging on line.
C. We can arrange installers to your factory to guide the
installation work if needed,this service is chargeable.
D. After the debugging, will provide complete training and track
the equipment's usage regularly.
3. How is your company's after-sales service done?
A. 1 year parts warranty, parts mainly include
fans,burners,electric components of control cabinet,metal
structure,wall panels etc,except the case of man-made damage.
B. As long as you have been using our equipment, our technical
support will always be online
Hope our warm company can meet friendly you and bring you a
different experience.
![]() |