Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | ABD |
Model Number : | VPL |
Certification : | CE |
Price : | Negotiate |
Payment Terms : | L/C, T/T |
Supply Ability : | 5 sets per month |
Delivery Time : | 4 months |
Aluminum Profiles Full Automatic Vertical Powder Coating Line
1.Fully automatic control: The workpiece is fully automatically
controlled from the blank pendant to the sprayed finished product.
2.Low energy consumption: The curing furnace adopts the square
furnace design, the heat source utilization rate reaches the
highest, and the energy saving is more than 15%.
3.Labor saving: automatic control is adopted to reduce labor
intensity and save 60 labors.
4.Low powder consumption: high powder application rate at one time,
uniform film thickness on the surface of the workpiece, which can
save 20% of powder.
5.Small footprint: The production line equipment with a monthly output of 2000T occupies a workshop of W20m * L53m meters.
6.Output: The output can be designed from 1000T/month to
2000T/month according to user needs.
![]() |